9 Mistakes to Avoid When Ordering Custom Kitchen Cabinets

Mistakes to Avoid When Ordering Custom Kitchen Cabinets

The process of ordering custom kitchen cabinets is different than the process of ordering a cabinet off a showroom floor. There are drawings to approve, measurements to confirm, appliances to lock in, and hardware to finalise before production even begins. Get any one of these wrong, and it can mean delays, extra costs, or cabinets that don’t quite fit your kitchen.

This guide focuses on the ordering and pre-production process specifically, not on how to choose a cabinet maker in the first place (we’ve covered that in 7 Questions to Ask Your Kitchen Cabinet Maker), but on what actually trips homeowners up once they’ve committed and the process is underway.

Here are 9 mistakes worth knowing about before you sign off on anything.

Avoid These 9 Costly Custom Kitchen Cabinet Mistakes

1. Picking on Price Alone

Everyone wants a bargain. But the cheapest quote on the table usually got there by cutting somewhere, and it’s rarely somewhere you can see straight away.

Thin board. Basic hinges. Hardware that’s fine for the first year and then starts to sag. Kitchen cabinet quality doesn’t reveal itself on installation day. It shows up two or three years later, when a door won’t close properly, or the laminate starts lifting at the edges, right around when the warranty conveniently runs out.

Quality kitchen cabinets are built with proper board, think Laminex or Polytec, and fitted with hardware from names like Blum and Hettich. Yes, it costs more upfront. It also lasts decades instead of a few years. Before you get swept up comparing bottom-line numbers, ask exactly what board and hardware are included, and have a look through the range of colours and finishes on offer. If the answer’s vague, take that as your cue.

2. Rushing Past the Design Stage

Every kitchen has its quirks. A wall that’s not quite square. A floor with a slight dip. A pipe sitting exactly where you wanted a drawer. Skip a proper design and measurement stage, and these little surprises don’t stay little.

The best kitchen cabinets are the ones where the design is done by taking into consideration how your household actually lives and not lifted from a catalogue. That means having an initial consultation, picking up materials, getting an accurate measure and quote, and a design freeze before work even begins.

Don’t do it, and you’re risking cabinets that don’t fit, gaps you will see every day, or an unaccounted corner. It will be much more expensive to correct that afterwards than to do it correctly in the first place.

3. Not Carefully Reviewing and Approving Your Drawings

Once you approve your drawings, production usually starts. Changes after that point can be slow, costly, or sometimes not possible at all.

Before you sign off, go through every drawing properly. Look at cabinet sizes, drawer and door layouts, appliance cut-outs, and anything else you requested. If there is something that doesn’t sound great on paper, it’s not going to sound great in your kitchen.

Do not approve your cabinetmaker’s drawings by email; ask for a walk-through, either in person or over the phone. One of the easiest things to do and most costly to do wrong.

4. Leaving Appliance Specs Unconfirmed

The cabinets are usually designed around the dimensions of the appliances: the clearances for ovens, the rangehood, dishwasher and fridge cut out sizes and dimensions. Whether you haven’t decided on your appliances or you have decided but changed your mind once they are being manufactured, the cabinetry may no longer fit.

Ensure that all appliances are confirmed prior to drawings being approved, not after. If you’re still deciding on something, tell your cabinet maker so they can allow for it, rather than approving that section of the drawings before you’re certain.

Looking for a Cabinet Maker You Can Trust?

At Attila Kitchens, every cabinet is designed, manufactured and quality-checked in our Campbellfield workshop, giving Melbourne homeowners complete confidence from the first consultation to the final installation.

8. Not Getting a Clear Timeline for Your Project

Every kitchen is different, and so is the time it takes to design, manufacture and install one. Rather than relying on a rough guess, ask your cabinet maker for a written schedule specific to your project, one that covers the design and measure stage, manufacturing, delivery, and installation.

Timing at Attila Kitchens is dependent on the scale and scope of the project. In your design consultation, our team will go over an approximate timeline with you so you have a better idea of what to expect before making trades or a moving date.

Find out if a flat-pack kitchen may be a better option if you’re pressed for time, as pre-cut and pre-drilled items might arrive earlier than a custom assemblage. No matter, have the schedule written to plan around the actual date, not a guess.

9. Skipping Over Warranty and Aftercare Details

People will spend weeks agonising over door colours and then sign off on cabinetry without reading a word of the warranty. Hinges wear out.

Drawer runners take a beating over the years. Every great kitchen cabinet must be tweaked from time to time.

Enquire of your cabinetmaker what is covered by the guarantee, the length of time it lasts and who you should contact if there is a problem.

A cabinet maker who makes their own cabinet usually can repair it in a much shorter period of time than a cabinet maker who did the cabinet years ago and has since forgotten about the original supplier. Do NOT pay the deposit first and then get it in writing.

Conclusion

Custom kitchen cabinets are a long-term call on how your home works and feels every single day. Every mistake can be avoided as long as you ask the right questions before you sign anything.

Look for a highly skilled and top-rated custom kitchen cabinet maker who designs and builds under one roof, uses proper materials and hardware, checks their own work properly before it reaches your door, and hands you a clear, itemised quote the whole way through.

Attila Kitchens has been building cabinetry for Melbourne homes for over 30 years, backed by hundreds of five-star reviews across the Attila Group. Whether you’re after a fully custom kitchen, a flat pack option for part of your project, or an all-in-one package covering cabinetry through to stone benchtops, our Campbellfield team can help you get the ordering process right from the start.

Book a free design consultation and start things off on the right foot.

Ready to Get Your Custom Kitchen Right From the Start?

Avoid costly mistakes by working with a cabinet maker who can guide you through design, materials, measurements and manufacturing from the beginning.

Frequently Asked Questions

What’s the biggest mistake homeowners make when ordering custom kitchen cabinets?

Not checking the details closely enough before signing off. Measurements, appliance specs, hardware and exactly what’s included in the price are all worth confirming properly during the ordering process, not after production has started.

How do I know if a cabinet maker builds quality kitchen cabinets?

Enquire about the materials and hardware they employ, the processes they use to make cabinetry, the quality controls they use, how the cabinetry is installed, and what is covered in the warranty. Usually, one who can answer all this quite clearly and can manufacture in-house is a good sign.

What happens if I want to change something after I’ve approved my drawings?

It depends on the degree of production. Though changes can be made if it’s early enough, they may result in delays or higher costs once the manufacturing process is in full swing. This is why it’s important to make sure you’ve drawn your attention to the drawing and ask questions before you agree to it.

How long does it take to get custom kitchen cabinets made?

This will be determined by the size and complexity of your project. You don’t want to work on an guess, so ask your cabinet maker for a written timeline for design and measurement, manufacturing, delivery and installation.